Below is a look into the installations that accompanied the Glass Pavilion. Under the direction of Geoffrey Van Oeyen Annie Mak, Chris Andriassian, Chris Penfold, Christie Wang, Cicely Sugito, Denise Acosta, Johhny La, Jonathan Lee, Nelson Chen, Nicolas Oueijan, Noreen Wu, Sujean Park, and Yii Sha created a completely different environment named Pitch Figures. A play on the seaweed-like structural "tubes" in Toyo Ito's Sendai Mediatheque, "Pitch Figures" leverages the motion, verticality, and sound achieved by a field of suspended conduit pipes arranged in spatial figures that vary in plan and elevation. Grouped in ring formations, individual pipe lengths calibrate specific pitches. Pipes are dampened and codified with color paper bands. One's perception of touch, depth, and movement are engaged in this forest of sounds. Photo credit bottom two images Sujean Park
Friday, March 15, 2013
The Final Ties- Final Pieces
We had the wonderful experience of exhibiting our work to everyone who wandered into the School of Architecture. Our installation was surrounded by the benches and three other installations designed by our fellow second years creating a space filled with many individually designed environments. Our Glass Pavilion will continue to be exhibited at the University of Southern California until Friday. With our pavilion complete, we are waiting to see how it will respond to its changing environment. How will the viewer’s experience of glass change as the amount of sunlight or the amount of surrounding people or the surrounding sources of light change? We are exploring the life of our Glass Pavilion.
The Final Ties- The Support
We began by holding the ends in the form they were supposed to take. We then supported these ends using 8’ wooden members. While someone made a trip to home depot to get metal rods to replace the wooden members, the rest of us further corrected the shape of our structure by connecting our structure to the surround buildings with long sections of string. Once the metal rods arrived, we flattened one end, drilled a hole in it, and angled it. We then drilled into the base of our structure to secure the rods. These rods were then zip tied to the polycarbonate. After the final ties were complete, we cut the string and waited in suspense for our structure to fall, but it did not!
The Final Ties- Peeling
While this was happening some of us removed the plastic film covering each of the triangles. However, removing the plastic from the corners of the triangles proved challenging as some of the joints between the triangles were slightly overlapping and held onto the film. The zip ties served to further retain the pieces of plastic, but after using an olfa and a ladder to reach the elevated ends, all the plastic bits were removed from our structure. After securing the bottom of the polycarbonate using the metal footings and increasing the transparency of the project by removing the film, we still had to figure out how to support the cantilevered ends of our structure without nearby walls.
The Final Ties- The Move
Many members of our studio arrived early this morning to put the finishing touches on our installation, but little did we know that we had greater challenges waiting for us than removing plastic film from our structure. The School of Architecture once again insisted that we move our installation but only after we had mostly assembled our project. We had to detach the polycarbonate surface from our base not only because of its weight but because none of the exits from the courtyard were wide enough to accommodate our entire structure. We unbolted our structure, and many of us including our studio professor, Roland Wahlroos-Ritter, lifted the surface both from the inside and outside. We were able to more it through two doorways and around a corner. Next we moved our base angling it so that we could maneuver it around its surroundings. However, despite the madness of changing our site the day our project was due, our newest site was by far the best because it allowed our project to have the greatest amount of exposure as it was now oriented on the main axis of the School of Architecture. Additionally the widest end of the installation opened onto the main circulation axis of the School so that the structure beckoned for passer-byers to enter it. After figuring out the orientation of our Glass Pavilion in its new location, we realized it was necessary to secure the surface with additional footings. We drilled holes to attach each of the metal connections to the polycarbonate and the wooden base. Following is footage of our studio moving the Glass Pavilion. Music Credit- The Piano Guys Begin Again
Wednesday, March 13, 2013
The Sight of Glass
With Exhibition Day looming, it was time to put the finishing touches on our model. We began by zip tying each of the long stands to each other. After all of the pieces were joined into three large sections, we tightened all of the zip ties and cut the extra length from each of them. This will ensure that there are not long white strips interrupting the transparency of each of our pieces, a quality essential to many of our main design objectives. Next we drilled holes in the edge pieces of each strand so that we could attach them to the base. Many of us supported the first section as a screw was inserted through the hole in the polycarbonate and the metal connections. We put washers on either side of the plastic and finished the connection with a nut. After each of the three sections were connected in this manner, we zipped them together and began removing the plastic covering from the inside of each of the pieces. We left the outside plastic for tomorrow to ensure the transparency of the material would not be ruined by the nearby tree and its birds, but we have one final challenge left for tomorrow. The School of Architecture insisted that we move our site so the walls and joists which we were originally planning on using to support the cantilevering end of our structure will not exist anymore because our new site is the middle of a courtyard. We have to devise a system to secure these members without the assistance of our old site, a design twist right before deadline, but with a little more designing, we will be able to see our Glass Pavilion supporting itself by tomorrow morning. We can't wait to show off our pavilion to whoever comes to visit.
Tuesday, March 12, 2013
A Plethora of Pieces
The overall structure of our building is beginning to take shape as we assemble all of our pieces. We finished cleaning all of our triangles and began zip tying long strands together making sure to follow the numbering system we had originally set up when we plotted each piece. However, in order to preserve the transparency of each of our pieces we decided to keep our structure inside until the final steps of the assembly process. This presented some challenges because there is a limited amount of studio space to assemble each of the strands which are not independently self-supporting. We solved this problem by hanging a portion of our structure from our studio’s ceiling using mason line and supporting it from underneath with a piece of wood. It still remains for us to put each of our pieces together in our site. But for now, we look forward to a successful Wednesday.
Subscribe to:
Posts (Atom)